Volunteer project for the Aviation Museum in Finowfurt As part of a volunteer project, an air conditioning system is being integrated into the decommissioned Tupolev Tu-134 at the Finowfurt Aviation Museum. The aim is to air-condition the interior using the […]
Read MoreConversion of existing buildings
Here is the description of the category conversion in existing buildings
New spiral freezer – integration into existing NH₃ freezer system
Building extension with new spiral freezer – integration into existing NH₃ deep-freeze plant We took on the technical planning for an industrial food manufacturer as part of a building extension – with the aim of integrating a new spiral freezer […]
Read MoreNew chiller in the shopping center
Future-proof refrigeration technology for a shopping center – planning and concept development by cold.world Engineering
Read More